KIRK Process Solutions delivers Separator Sand Jet System for Ruby Gas Field Project, offshore Indonesia.
PT Heat Exchangers selected the KIRK KSJ-HN jet spray system for installation into a horizontal Production Separator, 2130mm ID. Manufactured in SS316L the system comprised 4 arms off a central header, each arm fitted with upper and lower flat spray arrays to sweep, fluidise and flush deposited sand from the base of the vessel into the drains.